{"id":1040,"date":"2025-02-17T12:11:01","date_gmt":"2025-02-17T12:11:01","guid":{"rendered":"https:\/\/ductofabinfra.com\/?page_id=1040"},"modified":"2025-02-18T08:46:31","modified_gmt":"2025-02-18T08:46:31","slug":"expertise","status":"publish","type":"page","link":"https:\/\/ductofabinfra.com\/?page_id=1040","title":{"rendered":"EXPERTISE"},"content":{"rendered":"\n<h2 class=\"wp-block-heading has-secondary-color has-text-color has-link-color wp-elements-f53690c49ce790e0fe30048168c86172\"><strong>Engineering<\/strong><\/h2>\n\n\n\n<p>Steel structure design and detailing involve the process of creating and analyzing structural steel components to ensure safety, stability, and efficiency in construction projects. Here\u2019s an overview:<\/p>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-739ba14fd41955b5a3c8aabdae10992b\"><strong>Steel Structure Design<\/strong><\/h4>\n\n\n\n<p>Steel design follows national and international codes (AISC &amp; IS 800-2007) &amp; Design Tools (STAAD&amp; MBS) &amp; Design Load code (IS\/875Part-1-5 &amp; MBMA) to ensure structural integrity.<\/p>\n\n\n\n<p><strong>Key Design Considerations<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><span style=\"text-decoration: underline;\">Load Analysis<\/span>: Dead load, live load, wind load, seismic load, and temperature effects.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Material Selection<\/span>: Choosing the right grade of steel.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Structural Stability<\/span>: Ensuring lateral stability, avoiding buckling, and designing bracing systems.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Connection Design<\/span>: Bolted and welded connections.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Serviceability<\/span>: Checking deflection limits, vibration, and fatigue resistance.<\/li>\n<\/ul>\n\n\n\n<p><strong>COMMON STEEL STRUCTURE<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><span style=\"text-decoration: underline;\">Buildings<\/span>: Industrial sheds, warehouses, high-rise buildings.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Bridges<\/span>: Truss, cable-stayed, suspension bridges , OWG, Bowstring Girder Bridge.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Frames &amp; Trusses<\/span>: Rigid frames, portal frames, space trusses.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-e1a4e49d5a674f2b27966391d6d7cec0\"><strong>Steel Structure Detailing<\/strong><\/h4>\n\n\n\n<p>Detailing is the process of preparing shop drawings and erection plans for steel fabrication and installation.<\/p>\n\n\n\n<p><strong>Key Components of Steel Detailing<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><span style=\"text-decoration: underline;\">Shop Drawings<\/span>: Individual components (columns, beams, braces, connections) with exact dimensions and specifications.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Erection Drawings<\/span>: Assembly sequence and on-site installation guidelines.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Bolt &amp; Weld Specifications<\/span>: Types, sizes, and locations.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">BIM &amp; 3D Modelling<\/span>: Tools like Tekla, AutoCAD<\/li>\n\n\n\n<li>Common Connection Types<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Bolted Connections<\/span>: Pre-tensioned and slip-critical bolts.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Welded Connections<\/span>: Fillet welds, groove welds, and moment connections.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Gusset Plates<\/span>: Used for trusses and braced frames.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-549e0057ceb704f23bb3d1fb1dc66228\"><strong>Engineering -Software.<\/strong><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li><span style=\"text-decoration: underline;\">Design Tools<\/span>: STAAD &amp; MBS<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Design Code<\/span>: AISC &amp; IS 800-2007<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Load Code<\/span>: IS\/875 Part 1-5 &amp; MBA<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Modelling<\/span>: Tekla<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Detailing<\/span>: Tekla &amp; AutoCAD<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading has-secondary-color has-text-color has-link-color wp-elements-30df456c5041ec43ea691237ac83a4d1\"><strong>Fabrication<\/strong> <\/h2>\n\n\n\n<p>At <strong>D.S. Ductofab Infra Division<\/strong> , we specialize in <strong>high-quality steel structure fabrication<\/strong>, delivering <strong>durable, precise, and cost-effective<\/strong> solutions for various industries. <strong>Our expertise<\/strong> in fabricating structural steel components ensures strength, longevity, and seamless integration into construction and industrial projects.<\/p>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-ac84641122d8cd0695f9139a464898f7\"><strong> Steel Fabrication Capabilities<\/strong><\/h4>\n\n\n\n<p>We provide <strong>Custom Steel Fabrication<\/strong> services, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><span style=\"text-decoration: underline;\">Structural Beams &amp; Columns<\/span> \u2013 Fabrication of I-beams, H-beams, channels, and tubular, Box sections for buildings, bridges, and industrial structures.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Steel Frames &amp; Platforms<\/span> \u2013 Manufacturing of heavy-duty frameworks, mezzanine floors, and load-bearing structures.<\/li>\n\n\n\n<li><em><span style=\"text-decoration: underline;\">Brackets &amp; Supports <\/span><\/em>\u2013 Precision-cut brackets, gussets, and reinforcement components to enhance structural integrity.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Steel Trusses &amp; Roof Structures<\/span> \u2013 Engineered trusses for industrial sheds, warehouses, and large-span buildings.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Pre-Engineered Steel Buildings (PEB) <\/span>\u2013 Custom-designed, factory-made steel buildings for quick installation.<\/li>\n\n\n\n<li><span style=\"text-decoration: underline;\">Fabricated Staircases &amp; Railings<\/span> \u2013 Industrial-grade steel staircases, walkways, and safety railings for commercial and industrial applications.<br><\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-885a45e8a9528c018352858fa3c018ce\"> <strong>FABRICATION &#8211; Process<\/strong><\/h4>\n\n\n\n<p>Steel structure fabrication and welding is a detailed process that involves cutting, shaping, assembling, and joining metal components to create structural frameworks used in buildings, bridges, industrial plants, and other infrastructure. Here\u2019s a step-by-step breakdown of the process:<\/p>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Step 1: Design &amp; Planning<\/strong><\/h5>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Engineers and designers create detailed blueprints and CAD models.<\/li>\n\n\n\n<li>Structural analysis ensures that the design meets load bearing and safety requirements.<\/li>\n<\/ul>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Step 2: Material Selection<\/strong><\/h5>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Different steel grades are chosen based on the structural requirements (e.g., mild steel, stainless steel, or high-strength steel).<\/li>\n\n\n\n<li>Steel plates, beams, channels, and pipes are sourced accordingly.<\/li>\n<\/ul>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Step 3: Cutting &amp; Shaping<\/strong><\/h5>\n\n\n\n<p><strong>CUTTING METHODS : <\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Plasma cutting<\/li>\n\n\n\n<li>Oxy fuel cutting<\/li>\n\n\n\n<li>Shearing cutting<\/li>\n<\/ul>\n\n\n\n<p><strong><strong>SHAPING METHODS :<\/strong><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Rolling<\/li>\n\n\n\n<li>Bending<\/li>\n\n\n\n<li>Pressing<\/li>\n<\/ul>\n\n\n\n<h5 class=\"wp-block-heading\"><strong><strong>Step 4: Drilling &amp; Machining<\/strong><\/strong><\/h5>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Holes for bolts, rivets, or connections are drilled using CNC machines.<\/li>\n\n\n\n<li>Additional machining processes (grinding, milling) ensure precise fitment.<\/li>\n<\/ul>\n\n\n\n<h5 class=\"wp-block-heading\"><strong><strong><strong>Step 5: Assembly &amp; Fitting<\/strong><\/strong><\/strong><\/h5>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Steel components are temporarily assembled (pre-fitting) before welding.<\/li>\n\n\n\n<li>Tack welding is applied to hold pieces together before final welding.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-8daa222f89adda9d6058eb59d9297547\"><strong>WELDING &#8211; Process<\/strong><\/h4>\n\n\n\n<p>Welding is the process of fusing metal pieces using heat and pressure.<\/p>\n\n\n\n<h5 class=\"wp-block-heading\"><strong><strong><strong><strong>Step 6: Welding Techniques<\/strong><\/strong><\/strong><\/strong><\/h5>\n\n\n\n<p>Common welding techniques for steel structures include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Shielded Metal Arc Welding (SMAW) \u2013 &#8220;Stick Welding&#8221;<\/li>\n\n\n\n<li>Gas Metal Arc Welding (GMAW) \u2013 &#8220;MIG Welding&#8221;<\/li>\n\n\n\n<li>Flux-Cored Arc Welding (FCAW) \u2013 Used in heavy structures<\/li>\n\n\n\n<li>Submerged Arc Welding (SAW) \u2013 For thick steel plates<\/li>\n<\/ul>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Step 7: Weld Inspection &amp; Quality Control<\/strong><\/h5>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Visual Inspection: Checking for surface defects.<\/li>\n\n\n\n<li>Non-Destructive Testing (NDT):     \n<ul class=\"wp-block-list\">\n<li>Ultrasonic Testing (UT)<\/li>\n\n\n\n<li>Radiographic Testing (X-ray)<\/li>\n\n\n\n<li>Magnetic Particle Testing (MPT)<\/li>\n\n\n\n<li>PWHT<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-2acaa187cdbcd349a3675aff1f3c460f\">SURFACE TREATMENT &amp; FINISHING &#8211; Process<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Cleaning:<\/strong> Removal of rust, scale, and welding residues by abrasive blasting up to SA 2.5<\/li>\n\n\n\n<li><strong>Coating &amp; Painting: <\/strong>Enamel, Epoxy, Fireproofing (Intumescent, Vermiculate) &amp; C5 categories paint<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading has-secondary-color has-text-color has-link-color wp-elements-da40a92ebecee490578b02555fde5778\"><strong>Erection &amp; Installation<\/strong><\/h2>\n\n\n\n<p>Erecting and installing a steel structure involves several critical steps to ensure safety, efficiency, and durability. Below is a general step-by-step guide to the process:<\/p>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-f057b8ccc6dc7f6cb3ff14bf6ed21eb8\"><strong>1.<\/strong> <strong>Planning &amp; Preparation<\/strong><\/h4>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Site Survey &amp; Preparation<\/strong><\/h5>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Conduct a site survey to assess ground conditions.<\/li>\n\n\n\n<li>Clear and level the site for foundation work.<\/li>\n\n\n\n<li>Ensure access roads and storage areas are ready.<\/li>\n<\/ul>\n\n\n\n<h5 class=\"wp-block-heading\"><strong><strong>Material Inspection<\/strong><\/strong><\/h5>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Verify steel components (beams, columns, trusses, etc.) for quality and accuracy.<\/li>\n\n\n\n<li>Check for any damage during transportation.<\/li>\n\n\n\n<li>Confirm all fasteners (bolts, nuts, and welding materials) are available.<\/li>\n<\/ul>\n\n\n\n<h5 class=\"wp-block-heading\"><strong><strong>Safety Planning<\/strong><\/strong><\/h5>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Prepare risk assessment and safety protocols.<\/li>\n\n\n\n<li>Ensure workers are equipped with PPE (helmets, gloves, harnesses, etc.).<\/li>\n\n\n\n<li>Provide proper training on lifting and working at heights.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-8bcb9a798034b9a1d9b484c10ce4c7f0\"><strong>2.<\/strong> <strong>Foundation Work<\/strong><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lay concrete foundations with anchor bolts installed at precise locations.<\/li>\n\n\n\n<li>Allow sufficient curing time for the foundation before proceeding.<\/li>\n\n\n\n<li>Verify anchor bolt placement with engineering drawings.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-3dc56e7f365dcec7780ab3086d1d0abb\"><strong>3.<\/strong> <strong>Safety Measures<\/strong><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Always follow local building codes and safety regulations.<\/li>\n\n\n\n<li>Use certified equipment for lifting and rigging.<\/li>\n\n\n\n<li>Implement fall protection measures.<\/li>\n\n\n\n<li>Conduct regular safety briefings and hazard assessments.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-320adac5608d6af295eae9a4577e1356\"><strong>4.<\/strong> <strong>Steel Structure Erection<\/strong><\/h4>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Column &amp; Beam Installation<\/strong><\/h5>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Erect vertical columns using cranes or mobile lifting equipment.<\/li>\n\n\n\n<li>Secure columns with anchor bolts and temporarily brace them.<\/li>\n\n\n\n<li>Lift and position horizontal beams or girders onto columns.<\/li>\n\n\n\n<li>Bolt or weld beams into place per design specifications.<\/li>\n<\/ul>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Bracing &amp; Alignment<\/strong><\/h5>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Install diagonal and lateral bracing for stability.<\/li>\n\n\n\n<li>Check vertical and horizontal alignment with surveying instruments.<\/li>\n\n\n\n<li>Tighten all bolts to the required torque levels.<\/li>\n<\/ul>\n\n\n\n<h5 class=\"wp-block-heading\"><strong><strong>Roof &amp; Wall Framing<\/strong><\/strong><\/h5>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Install roof trusses or purlins.<\/li>\n\n\n\n<li>Position and secure sidewall girt.<\/li>\n\n\n\n<li>Ensure proper alignment and spacing for roofing and cladding installation.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-86c945b548b559f009f55bc4c21cdc2b\"><strong>5.<\/strong> <strong><strong>Welding &amp; Bolting<\/strong><\/strong><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Perform on-site welding as needed, ensuring proper joint penetration.<\/li>\n\n\n\n<li>Tighten all bolts progressively and check for proper tension.<\/li>\n\n\n\n<li>Inspect all connections per quality and safety standards.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-e0dc40fd15fce502db6a6de5fc7c8c23\"><strong>6.<\/strong> <strong><strong><strong>Roofing &amp; Cladding Installation<\/strong><\/strong><\/strong><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Install metal sheets or sandwich panels on the roof and walls.<\/li>\n\n\n\n<li>Ensure proper overlapping and fastening for weather resistance.<\/li>\n\n\n\n<li>Seal joints and edges to prevent leaks.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-96250c4932675a10400a816f29b67159\"><strong>7.<\/strong> <strong>Safety Measures<\/strong><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Conduct structural integrity tests (load tests if necessary).<\/li>\n\n\n\n<li>Inspect all bolts, welds, and connections.<\/li>\n\n\n\n<li>Check for misalignments and correct any deviations.<\/li>\n\n\n\n<li>Ensure all bracing and safety features are in place.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-70b2fa6c068305262bdd55709056fc2b\"><strong>8.<\/strong> <strong><strong><strong><strong>Handover &amp; Maintenance<\/strong><\/strong><\/strong><\/strong><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Conduct a final walkthrough with the client and engineers.<\/li>\n\n\n\n<li>Provide documentation of quality tests, material certifications, and maintenance guidelines.<\/li>\n\n\n\n<li>Schedule periodic maintenance for long-term structural integrity.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Engineering Steel structure design and detailing involve the process of creating and analyzing structural steel components to ensure safety, stability, and efficiency in construction projects. Here\u2019s an overview: Steel Structure Design Steel design follows national and international codes (AISC &amp; IS 800-2007) &amp; Design Tools (STAAD&amp; MBS) &amp; Design Load code (IS\/875Part-1-5 &amp; MBMA) to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1040","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>EXPERTISE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ductofabinfra.com\/?page_id=1040\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EXPERTISE\" \/>\n<meta property=\"og:description\" content=\"Engineering Steel structure design and detailing involve the process of creating and analyzing structural steel components to ensure safety, stability, and efficiency in construction projects. Here\u2019s an overview: Steel Structure Design Steel design follows national and international codes (AISC &amp; IS 800-2007) &amp; Design Tools (STAAD&amp; MBS) &amp; Design Load code (IS\/875Part-1-5 &amp; MBMA) to [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ductofabinfra.com\/?page_id=1040\" \/>\n<meta property=\"og:site_name\" content=\"DUCTOFAB INFRA DIVISION\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-18T08:46:31+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@DS_DUCTOFAB\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ductofabinfra.com\/?page_id=1040\",\"url\":\"https:\/\/ductofabinfra.com\/?page_id=1040\",\"name\":\"EXPERTISE\",\"isPartOf\":{\"@id\":\"https:\/\/ductofabinfra.com\/#website\"},\"datePublished\":\"2025-02-17T12:11:01+00:00\",\"dateModified\":\"2025-02-18T08:46:31+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/ductofabinfra.com\/?page_id=1040#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ductofabinfra.com\/?page_id=1040\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ductofabinfra.com\/?page_id=1040#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/ductofabinfra.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"EXPERTISE\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ductofabinfra.com\/#website\",\"url\":\"https:\/\/ductofabinfra.com\/\",\"name\":\"DUCTOFAB INFRA DIVISION\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ductofabinfra.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"EXPERTISE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ductofabinfra.com\/?page_id=1040","og_locale":"en_US","og_type":"article","og_title":"EXPERTISE","og_description":"Engineering Steel structure design and detailing involve the process of creating and analyzing structural steel components to ensure safety, stability, and efficiency in construction projects. Here\u2019s an overview: Steel Structure Design Steel design follows national and international codes (AISC &amp; IS 800-2007) &amp; Design Tools (STAAD&amp; MBS) &amp; Design Load code (IS\/875Part-1-5 &amp; MBMA) to [&hellip;]","og_url":"https:\/\/ductofabinfra.com\/?page_id=1040","og_site_name":"DUCTOFAB INFRA DIVISION","article_modified_time":"2025-02-18T08:46:31+00:00","twitter_card":"summary_large_image","twitter_site":"@DS_DUCTOFAB","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ductofabinfra.com\/?page_id=1040","url":"https:\/\/ductofabinfra.com\/?page_id=1040","name":"EXPERTISE","isPartOf":{"@id":"https:\/\/ductofabinfra.com\/#website"},"datePublished":"2025-02-17T12:11:01+00:00","dateModified":"2025-02-18T08:46:31+00:00","breadcrumb":{"@id":"https:\/\/ductofabinfra.com\/?page_id=1040#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ductofabinfra.com\/?page_id=1040"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/ductofabinfra.com\/?page_id=1040#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ductofabinfra.com\/"},{"@type":"ListItem","position":2,"name":"EXPERTISE"}]},{"@type":"WebSite","@id":"https:\/\/ductofabinfra.com\/#website","url":"https:\/\/ductofabinfra.com\/","name":"DUCTOFAB INFRA DIVISION","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ductofabinfra.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/ductofabinfra.com\/index.php?rest_route=\/wp\/v2\/pages\/1040","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ductofabinfra.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ductofabinfra.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ductofabinfra.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ductofabinfra.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1040"}],"version-history":[{"count":9,"href":"https:\/\/ductofabinfra.com\/index.php?rest_route=\/wp\/v2\/pages\/1040\/revisions"}],"predecessor-version":[{"id":1063,"href":"https:\/\/ductofabinfra.com\/index.php?rest_route=\/wp\/v2\/pages\/1040\/revisions\/1063"}],"wp:attachment":[{"href":"https:\/\/ductofabinfra.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1040"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}